Customer :


Role :

Reservoir Engineering, Technical Assistance

Key date :

Commissioning 2001

Location :

Diadema, Argentina, Argentina

Description of the Project

120 Million m3 working gas capacity in a depleted gas field located in Diadema (Chubut, Argentina).

  • 10 injection/production wells
  • Total gas capacity 400 Million m3
  • Max. injection rate: 1.25-106 Nm3 /day
  • Max. withdrawal rate: 1.25-106 Nm3 /day
  • Commissioning and start up in 2001

Work done and added value of our solution

  • Assistance to conversion to UGS facility, Feasibility and Subsurface Basic Design studies
  • Seismic interpretation
  • Petrophysical analysis
  • Construction and history-matching of a 3D reservoir model
  • Reservoir follow-up and technical assistance to storage operation
  • Capacity extension studies using the 3D model
  • Assistance to operation

Back to the references Return to Geostock reference map


  • depleted gas field